INSTALLATION / SECOND GENERATION
Star Ring B installation manual
Star Ring B panel installation instructions, July 2026 edition.
Pre-installation checks
Scope: currently sold second-generation Star Ring B for wood and stone. Uses a matching housing; no standard 86-type back box is needed.
Installation space: panels 8–38mm thick; surface thickness plus clearance must exceed 40mm. A panel within the thickness range does not by itself establish sufficient rear clearance. Check both conditions.
Before cutting, confirm the actual panel thickness, rear clearance, fixing structure, module functions and arrangement. Check the relevant opening and assembly drawings in the manual. Confirm fabrication feasibility first for special panels or composite constructions.
Finish coordination: consider grain direction for wood, and cutting position and veining for stone. For customization, confirm installation position and orientation before arranging material shipment and fabrication through QIANXING’s process.
Wiring reference: page 8 of this manual contains wiring diagrams. Smart touch switches require live and neutral wires, including for conventional use.
Version note: this page provides the original July 2026 document. The 2025 second-generation models correspond to the currently sold structure. Follow the original manual for construction; this web checklist does not replace complete dimensioned drawings.